Created on
2026-03-18T08:54:44.432834Z
Created by
Dylan Kiew
Last modified
2026-03-18T08:54:44.432834Z
Last modified by
Dylan Kiew
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2099-09-09
Notes
PC: This is a system consists of 2 Detectors: 1290 DAD (S/N DEBAF00270) & 1260 RID (S/N DEAA600833). Quote based on the system by itself.
Last modified
2026-03-18T09:11:45.793242Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2099-09-09
Notes
Note: Send quote 1 month prior PM date!
Last modified
2026-03-18T09:11:45.793269Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2024-10-14
Notes
PO rcvd: 3030533 (=>QT-202408017R1 & QT-202408018R3): For YR 1 of 3-YR Annual PM Contract with 1-YR (OPTIONAL) - Annual PM for Agilent Detectors [G1362A (RID), DEAA600833] & [G4212A (DAD), DEBAF00270] & Annual PM for Agilent FLD System (DE90960622)
Last modified
2026-03-18T09:11:45.793214Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2024-09-09
Notes
J04759 (=>3026254) : Performed PM for HPLC Detectors (G1362A, DEAA600833 & G4212A, DEBAF00270). PM completed as per checklist requirement.
Last modified
2026-03-18T09:11:45.793186Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2024-08-15
Notes
QT-202408017: 3-YR Annual PM Contract with 1-YR (OPTIONAL) Annual PM for Agilent Detectors [G1362A (RID), DEAA600833] & [G4212A (DAD), DEBAF00270]
Last modified
2026-03-18T09:11:45.793158Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2023-08-07
Notes
J04759 (=>3026254) : Performed PM for HPLC Detectors (G1362A, DEAA600833 & G4212A, DEBAF00270). PM completed as per checklist requirement.
Last modified
2026-03-18T09:11:45.793130Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2023-07-28
Notes
PO rcvd : 3026254 (=>QT-202306043R1) : PM of Agilent Detectors [G1362A (RID), DEAA600833] & [G4212A (DAD), DEBAF00270]
Last modified
2026-03-18T09:11:45.793102Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2023-07-13
Notes
QT-202306043R1 : PM of Agilent Detectors [G1362A (RID), DEAA600833] & [G4212A (DAD), DEBAF00270]
Last modified
2026-03-18T09:11:45.793073Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2023-06-30
Notes
QT-202306043 : PM of Agilent Detectors [G1362A (RID), DEAA600833] & [G4212A (DAD), DEBAF00270]
Last modified
2026-03-18T09:11:45.793044Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2022-06-08
Notes
J04490 (=> PO: 3022230) : Performed PM on Agilent Detectors - G1362A (RID) & G4212A (DAD).
Last modified
2026-03-18T09:11:45.793016Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2022-06-02
Notes
PO rcvd: 3022230 (=>QT-202205034) : PM of Agilent Detectors - G1362A (RID) & G4212A (DAD).
Last modified
2026-03-18T09:11:45.792988Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2022-05-18
Notes
QT-202205034 : PM of Agilent Detectors - G1362A (RID) & G4212A (DAD).
Last modified
2026-03-18T09:11:45.792960Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2021-09-01
Notes
J04457: LC System pre-run time is too long during interval injection. Check on systems network & LC configuration. Check on running sequence & methods on customer system. Edit LC configuration & uncheck Optical unit temperature control. Check on sequence & method & performed runs. Pre-run is able to proceed on injection. Educate customer to be aware on setting up sequence run in future. Remark: Removed RID control & switched network setting via DAD. DAD ID address set to 192.168.100.12.
Last modified
2026-03-18T09:11:45.792930Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2021-05-21
Notes
J04126: Performed PM for G1362A (RID) & G4212A (DAD) detector.
Last modified
2026-03-18T09:11:45.792901Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2021-03-25
Notes
PO rcvd: 3017744 - PM of Agilent Detectors - G1362A (RID) & G4212A (DAD).
Last modified
2026-03-18T09:11:45.792870Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2021-03-16
Notes
QT-202103041: PM of Agilent Detectors - G1362A (RID) & G4212A (DAD).
Last modified
2026-03-18T09:11:45.792842Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2020-06-18
Notes
J04264: DAD failed wavelength calibration. Verification and Intensity Test. Ordered and replaced DAD Optical Unit. Refresh the firmware to B.07.20. Perform wavelength calibration. Verification & Intensity tests passed using both maxlight cartridge test cell as well as customer's flow cell G4212-60007. New Optical unit require new upgrade firmware in order to work with test flow cell due to RFID changes.
Last modified
2026-03-18T09:11:45.792814Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2020-06-03
Notes
J04261: Performed PM on G4212A and G1362A. Flushed system with new prepared water. Performed DAD waterlogging verification failed. Performed DAD calibration failed. Performed RID optical balance. Result -0.020. PM performed but with failures. DAD require further troubleshooting and replace max light cartridge to diagnose the problem. Need to send repair quotation to AB Sciex before proceed with repair. A new Deuterium Lamp P/N 5190-0917 from customer was replaced.
Last modified
2026-03-18T09:11:45.792785Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2020-03-25
Notes
QT-202003062 : PM of Agilent Detectors - G1362A (RID) & G4212A (DAD).
Last modified
2026-03-18T09:11:45.792755Z
Next PM Date
{some date}
Has Notified Customer
{true / false}
Scheduled PM Dates
{re-schedule date #2}, {re-schedule date #1}, {schedule date}
Actual PM Date
2019-04-24
Notes
J01970: PM performed HPLC 1290 for 2 detectors - 1290 DAD & 1260 RID
Last modified
2026-03-18T09:11:45.792727Z